Kathie and I have been working at tiling the new sunporch floor. Here is my faithful coworker measuring and marking the perimeter tiles.
Here am I cutting one of those perimeter tiles with a wet saw kindly loaned to us by cousin Mark. If the picture seems blurry, it is because of the water vapor spewing into the air as I make the cut on the tile.
Here is what the floor currently looks like. We have now cemented the perimeter tiles into place and have cleaned all the tiles. Grouting comes next, then cleaning and sealing. This tiling business takes many days and lots of steps.
No comments:
Post a Comment